Hunzinger Completes GEA’s New Sustainable Facility in Janesville
Operations have begun at GEA’s new 86,000 square-foot fabrication, repair, logistics and training facility in Janesville, WI. The project [...]
Operations have begun at GEA’s new 86,000 square-foot fabrication, repair, logistics and training facility in Janesville, WI. The project [...]
Hunzinger served as general contractor for IDC Precision, an industrial manufacturer and distributor located at 600 Perkins Drive in [...]