ULINE I7 BRANCH WAREHOUSE: Located at 12354 Uline Way, Kenosha WI, Hunzinger served as Construction Manager for the new construction of a 647,000 SF Distribution Center Warehouse. EUA was the project architect with Pierce Engineers (Structural), Pinnacle Engineering Group (Civil), Ring & DuChateau (MEP) rounding out the design team.


The Daily Reporter Top Project 2022